Several BC Transit routes in Victoria closed or altered due to wind storm and condo fire
Crews are working to clean up the roads impacted.

As a result of last night’s winds, brought on by the ‘bomb cyclone’ weather system, a few BC Transit routes in the Victoria area have been impacted.
The winds have felled trees and large branches, impeding bus lanes and routes.
Additionally, a massive fire that destroyed a 77-unit condo building on Quadra Street and Palmer Road shut down the road, causing the bus route to be altered.
Related:
- Massive fire destroys 77-unit condo building under construction in Saanich
- Multiple highways closed as ‘bomb cyclone’ batters Vancouver Island
- Nearly 150,000 lose power on Vancouver Island due to overnight storm
Below are the impacts upon BC Transit caused by the storm:
- Route 6 – Quadra Street is closed at Lodge Ave and Palmer Road with buses detouring onto Tattersall Drive and getting to McKenzie Avenue via Saanich Road
- Route 61 – Ongoing delays are expected due to the current road conditions caused by the storm
- Route 63 – Just outside Sooke, Westcoast Road is closed west of Grant Road with detours using Helgesen Road
- Route 64 – The route between Langford and Sooke is cancelled due to downed trees and power lines
BC Transit can provide additional updates throughout the day via their alerts webpage.
Join the conversation
No comments yet — be the first to start the conversation
Add Victoria Buzz as a preferred source to help our reporting appear more often in Top Stories and Google’s AI results.






